Reinforced Concrete Piles
Spiral Drillers Civil has the ability to construct reinforced concrete piles in diameters from 300mm to 3600mm, and depths to 42m. Deep piles are constructed using our specialist fleet of drilling rigs. Small and shallow piles can be constructed with pendulum rigs.
Bored piles can be belled to up to 3600mm diameter with a special belling tool.
Grooving of piles can be achieved to the project specification.
Boreholes can be supported by temporary or permanent casings as per soil conditions; casing for all diameters can be installed and advanced ahead of drilling works using our various vibratory hammers.
In wet soil with high ground water levels, drilling can done using mineral (bentonite) or polymer slurries.
Application
- Contiguous wall
- Soldier pile wall
- Palisade wall
- Foundation piles for building and structures
- Bridge piles
- Plunger piles for top down construction
Projects
| Project Name - University of Auckland Engineering School |
Project description |
Drill 900mm diameter and 1200mm diameter building piles approx. 20m deep with all piles being spiral grooved |
Machine used |
2 x Soilmec drilling rigs |
Special difficulties |
Project finished ahead of schedule and on budget |
|
 |
| Project Name - Grower's Stadium, Pukekohe - Light Foundations |
Project description |
Construct 1500mm diameter x 10m deep piles for light towers |
Machine used |
Soilmec R312 |
Special difficulties |
As this is a rugby stadium, no damage could be caused to the grounds. Project completed on schedule |
|
 |
| Project Name - Rydges Hotel, Auckland |
Project description |
Construct 17 piles ranging from 450mm diameter to 750mm diameter up to 20m deep with all piles being spiral grooved |
Machine used |
Soilmec CM39 and pendulum machines |
Special difficulties |
Traffic management and pedestrian access required. Restricted site area to work in |
|
 |
| Project Name - Rydges Hotel, Auckland |
Project description |
Drill 5 x 450mm diameter x 16m deep micro piles to underpin and strengthen existing foundations |
Machine used |
MTrack |
Special difficulties |
A challenging project as drill heads had to be altered to penetrate through rock and there was limited head height |
|
 |
| Project Name - 1 Hobson Street, Auckland |
Project description |
Construct pile foundations for high rise building with underground carpark |
Machine used |
Soilmec CM39 |
Special difficulties |
Penetration through existing seawall required |
|
 |
| Project Name - Hepburn Substation, Auckland |
Project description |
Drill 1500mm diameter x 4m deep pole foundation for wires feeding into substation |
Machine used |
Volvo 14T |
Special difficulties |
Overhead power wires |
|
 |
| Project Name - Vodafone Tower, Pt Chevalier |
Project description |
Construct cast in-situ pile foundations 900mm diameter x 15m deep for Vodaphone tower |
Machine used |
Soilmec CM39 |
Special difficulties |
Site had to be kept clean at all times due to close proximity to road |
|
 |
| Project Name - Drake Street, Auckland |
Project description |
Soldier pile retaining wall on boundary of construction site, topdown construction used to create basement for new high rise building |
Machine used |
Soilmec CM39 & Volvo 14T |
Special difficulties |
Restricted access, limited workspace, drilling against existing buildings and restricted work hours due to residential properties in the vicinity. Old water wells on property had to be cased and cleaned out to enable location of new piles |
|
 |
| Project Name - Waimauku Village, Auckland |
Project description |
Drill and place poles with concrete, drive poles, and install tiebacks to deadman to strengthen 100m long x 3.5m high timber retaining wall |
Machine used |
PD1200 & PC200 |
Special difficulties |
Working in conjunction with earthmoving contractor constructing new retaining wall for village shops. Limited timeframe for completion of project |
|
 |
| Project Name - New World, Remuera |
Project description |
Drill and construct 20 piles for refurbishment of supermarket |
Machine used |
Yanmar 1.5T |
Special difficulties |
Confined space, work had to be carried out through the night before opening the next day and aisles had to be kept clean |
|
 |
| Project Name - Ranfurly Street, Epsom |
Project description |
Drill 600mm dia x 7m deep soak hole behind house |
Machine used |
EX40 |
Special difficulties |
Difficult access |
|
 |
| Project Name - Hobsonville, Auckland |
Project description |
Abutment retaining piles for new bridge |
Machine used |
Mercedes Unimog |
|
 |
| Project Name - Herne Bay |
Project description |
Drill 73 x 450mm to 600mm diameter x 9m deep piles along boundary line for excavation of new basement for house |
Machine used |
Volvo 14T |
|
 |
| Project Name - Great South Road, Penrose |
Project description |
Drill 600mm diameter sign foundation into solid basalt rock |
Machine used |
Soilmec R312 |
Special difficulties |
Traffic management required as working on roadway |
|
 |
| Project Name - Slip Repair, Auckland |
Project description |
Drill 600mm diameter x 15m deep piles for slip repair |
Machine used |
Soilmec CM39 |
Special difficulties |
Working off existing road to stabilize potential slip |
|
 |
| Project Name - Transpower tower foundations |
Project description |
Install 12 x 1800mm diameter x 16m deep foundation with permanent caisson |
Machine used |
Soilmec R312 |
|
 |
| Project Name - Bridge 51, Glen Eden Railway Station |
Project description |
Drill piles at side of railway line for new pedestrian bridge |
Machine used |
Soilmec CM39 |
Special difficulties |
Working in the rail corridor with consequent limited room and working hours |
|
 |
| Project Name - Kerikeri Bridge |
Project description |
Drill and construct 900mm diameter piles using permanent casings down to rock. Pier piles were in clusters of 10 with abutment piles each end |
Machine used |
R312 |
|
 |
| Project Name - Ormiston Road Bridge |
Project description |
Drill 16 cast in situ piles x 750mm diameter x 13m deep and drive 98 350SED poles ranging from 4 – 8m in length |
Machine used |
Soilmec R312 and PD1200 pile driver |
|
 |